Longest Cable Bridge Ready for Travel

Date:

Karnataka has achieved a major milestone with the successful load test of its longest cable-stayed bridge over the Sharavathi River in Sagar Taluk. Spanning 2.14 kilometers and costing ₹456.67 crore, this bridge connects Holebagilu and Kalasavalli, marking a significant step in enhancing regional connectivity.

The bridge underwent a rigorous load test, during which 100 tonnes of truckloads were positioned on it. The structure showed only a 22 mm deviation, well within the permitted 38 mm and returned to its original position once the load was removed, confirming its durability and the quality of construction.

This engineering marvel not only facilitates smoother transportation but also stands as a testament to the state’s commitment to infrastructure development. The bridge’s completion is poised to boost local economies and improve the daily lives of residents.

We commend the engineers, workers and officials whose dedication made this project a reality. Their efforts have paved the way for a brighter, more connected future for Karnataka.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

spot_img

Share post:

Subscribe

More like this
Related

India’s First Hydrogen Highways Are Here!

India is taking a bold and exciting step...

Branded Residences: A Strategic Differentiator for India’s Real Estate Developers

In India, branded residences are emerging as a powerful...

NPG’s 98th Meeting Advances Seven Strategic Infrastructure Projects under PM GatiShakti

At its 98th session, the Network Planning Group (NPG)...

Tower Hamlets Joins Innovative Reuse Pilot to Transform Construction Waste

Tower Hamlets Council has joined the ROMULUS (Reuse Of...