Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the miniorange-login-openid domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/maximinfra/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/maximinfra/public_html/wp-includes/functions.php on line 6121
PHED Rajasthan Invites Bids for Rs 606.79 Cr Kaliteer Water Supply Project under HAM - Maximinfra News

PHED Rajasthan Invites Bids for Rs 606.79 Cr Kaliteer Water Supply Project under HAM

Date:

The Public Health Engineering Department (PHED) of Rajasthan has invited bids for the Kaliteer Water Supply Project in Dholpur district. The project will be implemented under the Hybrid Annuity Model (HAM) as part of the Jal Jeevan Mission.

The scope of the project includes the construction of water treatment plants (WTPs), clear water reservoirs (CWRs), and clear water pumping houses (CWPHs), along with the development of clear water transmission mains from the WTPs to various Intermediate Pumping Stations (IPSs). Additionally, rising mains to Elevated Service Reservoirs (ESRs), construction of ESRs, and village-level water distribution networks will be developed. The project also includes the provision of Functional Household Tap Connections (FHTCs) and allied works.

The work will be carried out across Dholpur, Bari, Baseri, Sarmathpura, and Saipau blocks in Dholpur district, and the Bayana block in Bharatpur district. With a construction period of 36 months, the project also includes a 10-year operation and maintenance (O&M) phase, which features a one-year defect liability period.

The total project value is estimated at Rs 606.79 crore. The last date for bid submission is 05 May 2025.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

9 + nine =

Share post:

Subscribe

spot_img

Popular

More like this
Related

Latest Construction Machinery News in India

Latest Construction Machinery News in India: Key Innovations and...

Top Construction News Portal in India

Top Construction News Portal in India: Stay Informed on...

Latest International Construction News in India

Latest International Construction News in India: Emerging Global Trends Latest...

Latest Domestic Construction News in India

Latest Domestic Construction News in India: Trick Insights and...